Action > InsideRT > Making of Remmi-Team's new vehicle Remmi 7, January-May 2008

Here you can affiliate to the progress of making Remmi-Team's new vehicle Remmi 7.
See also Remmi 7 data.
Action is supported by our sponsors and partners.
Katso myös suomeksi ffp:n keskustelualueen säie tästä.

Making of Remmi 7, 2008
Music: Ratas, Pajula Records Oy

France 2008

Building continued in France. Finally we got (at least most of) the vehicle ready. Here are few pictures how it finally looked like.
More pictures from France you can find here.

pic pic pic pic pic

Final countdown - MAY

18.5.2008 T-Minus 2 hours

Time is running out.

pic pic pic

17.5.2008 3am

Some fine tuning and FIRST TEST WITH WORKING BODY+ENGINE! Still 26 hours time before we start our trip to France. 500 meters of testing already ;)

pic pic pic pic pic pic

15.5.2008 10pm

Some taping, electronics are ready and our F1 Monaco GP tickets arrived \o/. We also got first "smoke" out from engine. 3 days time to complite the rest.

pic pic pic pic pic pic pic

15.5.2008 3am

Fine tuning for the vehicle and for our "new" car. New steering "wheel" is getting its form.

pic pic pic pic pic pic pic

13.5.2008

Making new wiring and some other stuff.

pic pic pic pic pic pic

11.5.2008

Seven days time to complete the vehicle. Literally some light can be seen in the end by our driver. Bodywork is almost done now.

pic pic pic pic pic pic pic pic pic pic pic

9.5.2008

Some relaxing for a change, sauna, beer and pictures tells the rests

pic pic pic

8.5.2008

A fuel tank finds it's place in the chassis. Also some fine adjustment is required here and there.

Teijo finishing the upper shell.

Antti presenting Remmi 7's to do- list.

Our drivers Minna and Marjo-Riikka testing new outfits.

Window molds. A heated plastic places a mold with the help of vacuum.

Janne puts tapes to our Transit. With this van we will make our trip to France in May.

pic pic pic pic pic pic pic pic pic pic pic pic pic pic pic

5.5.2008

Chassis gets wheels and first tests done without engine running.

pic pic pic

4.5.2008

Front wheel holders and pivots all set. Kalle carried out most of plans and structure.

Currently we are laminating the bodywork. A bottom half is almost ready. Teijo and Ilari laminating.

Random acts. A window mold is made of classfiber.

pic pic pic pic pic pic pic pic pic pic pic

Mechanization - APRIL

22.4.2008

The negative mold of the bodywork is completed. The mold consist of seven sectors made mainly of glass fibre.

Hynynen and Taipale master the skills of teamwork.

Opening the negative mold proved to be a cautious task.

The experiment of making a carbon rim showed us many ways of how to not make a carbon rim. Yet we have one.

The chassis is made up steadily. It performs a firm structure. Many rigiding pieces are laminated to the chassis and many inserts and small components are installed. A steering implementation is concluded and the new type of brakes settles to the realization of the vehicle.

Our driver Minna finds it easy to adjust to appropriate mood.

pic pic pic pic pic pic pic pic pic pic pic pic pic pic pic pic pic pic pic pic

7.4.2008

The Negative mold of carbon rims is ready. Laminating the negative mold of the bodywork progress well. First out of seven sectors is ready. Hynynen took very good care of polishing the mold of the bodywork.

pic pic pic pic

6.4.2008

Month passes and for Nogaro Remmi 7 is very likely to be completed since no grave complications occured. Many in Team is highly motivated to build this new vehicle ready to compete in about 40 days.

The positive mold of the bodywork is finished. Laminating the negative mold of body has started and in few weeks we are able to laminate the bodywork. The mold for carbon rims is also finished. Many inserts and small parts have been milled.

The carmarket Magneetti held theme event Green week few weeks ago. Remmi-Team presented there current vehicles Remmi 6c and Remmi UC1.

pic pic pic pic pic

A lost gripper - MARCH

5.3.2008

A lot has happened in Team during past days. The positive mold is getting it's final shape. The positive mold will be laminated with light weight class fiber to make it more rigid. We cleared a corner in our club room to be place for laminating the negative mold of the bodywork.

We have nice positive mold for the negative mold of carbon rims. Qualified by Kankkunen.

We also have driver approved chassis.

A carmarket Magneetti helds theme event "Vihreä viikko" next week in Vantaa. Remmi-Team presents current vehicles Remmi 6c and UC1.

Kalle tunes UC1 to get the best of it for the upcoming fair.

pic pic pic pic pic pic pic pic pic

Light at the end of the tunnel - FEBRUARY

27.2.2008

The positive mold of the bodywork is in our team room. We start finishing the mold immediately and the negative mold of the bodywork is expected to be laminated in no time.

Another interesting ongoing project concerns making carbon rims. We are expected to have two to three hundred grams lighter rims made of carbon fibre with total wheel weight less than 1500 grams.

pic pic

25.2.2008

Hynynen milled the positive mold of the bodywork in Sysmä last friday. We will start finishing the mold next wednesday.

There were lots of laminating during weekend. We succeeded repairing the chassis. We laminated the carrier of front wheels and some small rigid elements for bodyjoints. We also laminated an additional frame. In these new parts we used mainly nomex-honeycomp and carbon. For steering we made new set of springs wich require much less strenght to bend.

pic pic pic pic pic pic pic pic

20.2.2008

Antti took some serious time optimizing the bodywork of Remmi 7. He ended up minimizing the frontal area of the vehicle to 0.247 m2. The frontal area itself has a significant affect to fuel consumption.

The positive mold of the bodywork is going to be milled in Art Plast next weekend. Also planned of laminating some rigid parts of the chassis.

14.2.2008

Happy valentine's day! A bodywork for Remmi 7 is realizing. SPU Systems provides PUR plates for the positive mold of the bodywork. A glass-fibre negative mold for the bodywork is made on the positive mold.

We tested different sandwich structures of chassis in the heavy lab of Tampere University of Technology Institute of Applied Mechanics and Optimization. One sandwich structure was made of carbon-fibre and nomex honey-comp and one made of carbon-fibre and foam. Honey-comp structure performed well being 5mm thinner and lighter structure. Unfortunately we were not able to get sufficient amount of nomex honey-comp for our chassis so we ended up using foam instead.

pic pic pic pic

6.2.2008

Laminated chassis. Still missing a holder for front wheels and some small rigid elements.

pic

4.2.2008

FY-Composites provides us all the carbon fibres and resin. A bodywork is meant to be made of lightweight glass fibre and carbon fibre. Both have their benefits.

We encountered small issues relating to the laminating process. We ended up having small fractures in our chassis needed to be fixed. Nonentheless the chassis will be ready as scheduled. Also many features in Remmi 7 have their plans ready.

Endless project - JANUARY

31.1.2008

The chassis laminating process has started well. All the foams have been cut and plans for finishing made. In two days the chassis is laminated.

Added pics of the laminating process.

pic pic pic pic pic pic pic pic pic

28.1.2008

Added some old pics. This week the chassis is going to be laminated. Update coming!

pic pic pic pic pic pic pic

17.1.2008

Remmi 7 has been announced to be the next new vehicle of Remmi-Team.

Remmi 7 is designed to be smaller than previous vehicle Remmi 6c. This is achieved by optimizing vehicle's frontal area, setting camber angle of front wheels around -8 degrees and minimizing wheelbase. Remmi 7 is going to be lighter than Remmi 6c due to smaller and high end optimized structure. Vehicle's overall volume is 427 litres which is 30% less compared to Remmi 6c.

The chassis is plate spaceframe planed to be made of carbonfibre and foam. We also considered using Nomex-honeycomp. The mold for the chassis is almost done. The chassis is going to be laminated in few weeks.